How Many Renovation Quotes Should You Get, and How to Compare Them

How many renovation quotes to get, how to line them up item by item, and the red flags to spot before you sign with a firm in Singapore.

November 20, 2026

Three stacks of tile and laminate samples side by side on a dining table in an HDB flat

By The TAD Journal · Reviewed by Alex Yang

Short answer

Meet several firms, then compare detailed quotes from a shortlist that all worked from the same written brief. Line them up item by item, with quantities, units and materials, and treat big lump sums and vague materials as red flags.

You've met a few firms and now there are quotes on the table. They don't match. One is a two-page list, another runs to ten pages, and the totals are far apart.

This is normal. Firms write quotes in different ways, and the real differences hide in the detail. Here's how many quotes to get, and how to read them side by side so you compare the work, not just the price.

How many quotes to get

The CaseTrust homeowners' guidebook from the Consumers Association of Singapore (CASE) suggests meeting at least five renovators so you can make meaningful comparisons. We agree with meeting several. For detailed quotes, though, we suggest narrowing to two or three firms you would actually hire.

A detailed quote needs a site measure, a layout discussion and material choices. Doing that properly with five firms takes weeks of your weekends, and after the third set of drawings, quotes tend to blur together and you start choosing on price alone. Fewer than two leaves you with nothing to compare.

Give everyone the same brief

Most mismatched quotes start with mismatched briefs. Before you collect quotes, write down:

  • The rooms in scope, and what happens in each (keep, overlay, hack, replace).
  • The carpentry you want: kitchen cabinets, wardrobes, TV console, shoe cabinet, study desk.
  • Your preferred finishes, even roughly (tile type, laminate or veneer, the kind of countertop).
  • Appliances and fittings you'll buy yourself, so they aren't quoted twice or forgotten.
  • Your move-in date and your budget ceiling.

If a firm suggests a different approach, that's useful input. Ask them to show it as a separate option rather than folding it into the main price.

Build an apples-to-apples table

Put the quotes into a simple spreadsheet: one row per item, one column per firm. For each line, note:

  • Quantity and unit. Square feet, foot run, or a lump sum. Lump sums are the hardest to compare.
  • Material and brand. "Laminate" or "homogeneous tiles" can mean very different products and prices.
  • What's included. Internal fittings, handles, hinges, haulage, protection of existing surfaces, debris disposal, cleaning.
  • Exclusions. Anything marked "by owner", "provisional" or "subject to site condition".

CASE's guidebook makes the same point: quotes can differ because one leaves out items or cuts corners, so compare the scope, not only the total. It also describes fair pricing as itemised, with additional costs disclosed upfront.

When one firm has a line the others don't, ask the others whether it's included elsewhere or missing. Missing items usually come back later as variation orders, which is how a cheaper quote ends up costing more.

Red flags in a quote

  • Large lump sums like "kitchen package" with no breakdown of what's inside.
  • Vague materials ("tiles to be selected") without an allowance or a unit price.
  • No mention of electrical points, plumbing or hacking when your brief clearly needs them.
  • A deposit request above 20% before work starts. CaseTrust-accredited renovation businesses cap initial deposits at 20% of the total cost, which is a useful benchmark even if the firm isn't accredited.
  • Pressure to sign quickly for a discount that expires this week.
  • Promises made in conversation that don't appear in writing. CASE's guide advises getting every verbal promise documented.
  • For HDB flats, a firm that can't show it is listed in HDB's Directory of Renovation Contractors. HDB requires the contractor you engage to be on that list.

Look past the price

The cheapest quote is not always the lowest final bill, and the most expensive is not automatically the best work. Weigh these alongside the total:

  • How well they understood your brief. Did they ask how you live, or just measure?
  • Whether their past projects are similar in scope and finish to yours.
  • The payment schedule and the warranty terms.
  • Who your contact on site will be, and how they communicate.

CASE's view is that reliability should come before price or personal rapport. For a sense of where money usually goes and where it's safe to save, see our renovation budget guide. If you're still deciding what kind of firm to hire, start with interior designer or contractor.

Questions to ask before you pick a quote

  1. Is this quote based on a site measure, or only on the floor plan?
  2. Which items are provisional, and how will the final price be worked out?
  3. Which brands and series are the laminates, tiles and fittings?
  4. Does the price include haulage, protection, debris disposal and final cleaning?
  5. How are changes priced once we sign?
  6. What is the payment schedule, and which milestone triggers each payment?
  7. What warranty applies to workmanship, and for how long?
  8. Which company appears on the contract, and is it on HDB's directory?

Ask every firm the same questions and write the answers into your table. The gaps usually make the decision for you.

Comparing quotes right now?

Send us your brief on our enquiry page, or WhatsApp us. We'll quote it line by line, so you can compare it fairly with the others on your table.

About this article

Written by the TAD design team for The TAD Journal. Every article is reviewed by Alex Yang, co-founder of The Assembly Design. While Lopez Lam leads the design, Alex builds what holds it together: the standards each project is checked against, the team that carries them out, and a network of overseas makers for materials you won't find on the usual showroom shelf.