Services · Landed
Terrace, semi-detached and detached homes. We design and carry out interior works for landed homes. We do not take on full rebuilds.
How we price landed work
Typical build time
3 to 9 months, depending on the scope of work. Design discussions come first and are not included in this time.
Before you start
If your plans involve structural changes, extra approvals may be needed. We will flag this early, before you commit to a design.
We do not publish a price guide for landed homes. Share your plans and budget, and we will give you a realistic view of scope at the first meeting.
Our landed homes
What we take on
Full interior renovation
Layout changes within the existing structure, kitchens, bathrooms, flooring, carpentry, lighting and finishes across every floor of the house.
Kitchens and bathrooms
The rooms that age fastest in a landed home. Replacing them usually means new waterproofing and piping as well, which is worth doing once and doing well.
Carpentry and storage
Wardrobes, kitchen cabinets, under-stair storage and built-ins that make use of the awkward spaces older houses tend to have.
What we do not do
Full rebuilds, new extensions and major structural works. If your plans need these, you will need an architect and engineer. We will tell you at the first meeting rather than after you have committed.
What drives the cost
Size and number of floors
A three-storey terrace has more stairs, more bathrooms and more wiring runs than a condo of the same floor area. Every floor adds coordination as well as materials.
Age of the house
Older homes often hide tired wiring, old pipes and roof or wall leaks. These need fixing before new finishes go on, and they only show up properly at a site visit.
Wet areas
Landed homes usually have more bathrooms, plus a wet kitchen and outdoor areas. Each one needs waterproofing done right.
How much you change
Refreshing finishes in a sound house is a very different project from reworking every room. That is why we quote after seeing the house, not from a table.
01 Site visit
We walk the whole house with you, check its condition and talk through what you want to change. You get a realistic view of scope and budget at the first meeting.
02 Design and quotation
Space planning, materials and a design direction you can see before anything is built, with a quotation based on the actual condition of your home.
03 Approvals
Interior works usually need no planning approval, but anything that touches the structure or changes how the house looks from outside can. We flag this early, before you commit to a design.
04 Build
Our own project team runs the site, the trades and the schedule. Landed projects typically take 3 to 9 months to build, depending on scope.
05 Handover
A final walkthrough floor by floor, any defects fixed, and a home that is ready to live in.
Questions
Two terraces of the same size can need very different work, depending on their age, condition and how much you want to change. A table would mislead you, so we quote after a site visit and give you a realistic range at the first meeting.
Typically 3 to 9 months of building, depending on scope. Design discussions come first, and any approvals need to be in place before work starts.
No. We focus on interior renovation. For a rebuild or extension you will need an architect and engineer, and we will say so at the first meeting.
For a full interior renovation, most families move out. For a smaller scope, staying in is sometimes possible if works are phased floor by floor.
Yes. Grab bars, non-slip flooring, ramps and a ground-floor bedroom with an accessible bathroom can all be planned into the renovation. Read our guide to senior-friendly homes in 2026.
Start here
Tell us about your home, what you want to change and your timeline. We will arrange a site visit.
Send an enquiry