Renovation Payment Schedules: How Much to Pay, and When

How renovation payments are usually staged in Singapore: the deposit, progress payments tied to milestones, the final payment, and deposit protection.

November 24, 2026

HDB kitchen mid-renovation with cabinet carcasses installed and the floor protected

By The TAD Journal · Reviewed by Alex Yang

Short answer

Renovations are paid in stages, tied to milestones you can see on site. CaseTrust-accredited firms cap the deposit at 20% of the total, and CASE suggests holding back 5% to 10% until handover and defects are done.

Your quote is signed, or nearly. The next question is about money: how much do you hand over now, and when does the rest go out?

A good payment schedule protects both sides. You aren't paying far ahead of the work, and the firm has enough cash flow to order materials and pay the trades. Here's how to read one before you sign.

Why payments are staged

Renovation is paid in stages because the work happens in stages. Progressive payments mean that if work stops, you haven't lost a large sum paid upfront, and the firm has a reason to complete each stage. The CaseTrust homeowners' guidebook from the Consumers Association of Singapore (CASE) makes this case, and also asks homeowners to be fair: a firm that is treated reasonably is easier to work with when you need after-sales help.

The deposit

The deposit secures your slot and lets the firm start ordering. CaseTrust-accredited renovation businesses cap initial deposits at a maximum of 20% of the total cost. CASE's guidebook also advises homeowners to pay no more than 20% before work begins, with an exception for small single-task jobs, such as wardrobes for one room.

If a firm asks for much more than that upfront, ask why, and ask what protects that money if the business closes.

Progress payments tied to milestones

After the deposit, payments should follow visible milestones on site, not dates on a calendar. CASE's guidebook gives a sample schedule along these lines:

  • 15% on signing the contract
  • 25% at the start of renovation
  • 25% at the start of masonry works
  • 30% at the start of carpentry
  • 5% held back until all work is satisfactorily completed

Your schedule may look different, and that's fine. Carpentry is often a large part of the job, and boards and fabrication have to be paid for before anything is installed. What matters is that each payment is linked to something you can see on site, and that the amounts or percentages are written into the contract. The CaseTrust criteria for renovation businesses require a payment schedule that clearly states the amount to be paid at each stage.

Variation orders sit outside this schedule. Agree before you sign how they are billed (with the next milestone, or separately) and that each one is priced and agreed in writing before the work is done. Our post on variation orders explains why they come up and how to keep them small.

The final payment and retention

Keep a final portion back until handover is done and defects are fixed. CASE's guidebook suggests retaining 5% to 10%. This isn't about holding money over anyone. It gives both sides a clear point at which they agree the job is finished.

CASE also notes that most contracts include a 12-month defect liability period, and that contractors typically allow a short grace period after handover to report defects. CaseTrust-accredited businesses must give a 12-month workmanship warranty. Ask how defects are reported, and how quickly someone comes back to fix them.

How deposits are protected

CaseTrust-accredited renovation businesses must buy a deposit performance bond that safeguards deposit payments if the business closes, is wound up or goes into liquidation. Under the joint scheme CASE runs with the Singapore Renovation Contractors and Material Suppliers Association (RCMA), the bond also covers non-performance of the contract. Accredited firms must use the CaseTrust Standard Renovation Contract, which sets out payment schedules and progressive payments.

If your firm isn't accredited, ask directly how your deposit is protected, and get the answer in writing. If a dispute does arise, HDB treats hiring a renovation contractor as a private arrangement and points homeowners to CASE or the Small Claims Tribunal, so your contract and receipts are your main evidence.

Check this before you pay anything

  • The payment schedule is in the contract, with an amount or percentage for each stage.
  • Each payment is tied to a milestone you can check on site.
  • The deposit is 20% or less, unless it's a small single-item job.
  • You know how the deposit is protected, and it's in writing.
  • Variation orders are priced and agreed in writing before the work is done.
  • A final portion is held until handover and defect rectification.
  • Every payment goes to the company named on the contract, and you get an invoice or receipt for it.
  • You never pay for a stage that hasn't started.

A mistake we see is paying ahead to help the firm out, or to lock in a discount. It feels like goodwill, but it breaks the link between money and progress. If a stage then slips, you no longer have a natural point to pause and talk it through. Keep payments in step with the work, and keep quotes comparable from the start (see how to compare renovation quotes). Set aside a contingency too, so a surprise doesn't push you into paying early; our budget guide explains how much to keep back.

Want a schedule that makes sense?

Ask us how we stage payments on our enquiry page, or WhatsApp us. We'll walk you through each milestone before you sign anything.

About this article

Written by the TAD design team for The TAD Journal. Every article is reviewed by Alex Yang, co-founder of The Assembly Design. While Lopez Lam leads the design, Alex builds what holds it together: the standards each project is checked against, the team that carries them out, and a network of overseas makers for materials you won't find on the usual showroom shelf.